
|
In this view, the top of the tramway embankment is
shown, and a large depression is in the foreground left. This
turned out to be the entrance for a drainage culvert, to carry surface
drainage from one side of the tramway to the other. This is good
evidence that the tram system was built to last, and that proper
engineering considerations such as drainage were taken into account. |

|