| 
           
       | 
      In this view, the top of the tramway embankment is
        shown, and a large depression is in the foreground left.  This
        turned out to be the entrance for a drainage culvert, to carry surface
        drainage from one side of the tramway to the other.  This is good
        evidence that the tram system was built to last, and that proper
        engineering considerations such as drainage were taken into account.  | 
      
          
  |